Application ID: 7671
Project Title: Advance Planning: Campus Water Line Infrastructure Improvements (UNLV)
Agency: UNLV
Division: UNLV
Department: NSHE
Project Manager: BJW
Description: Develop construction documents and detailed cost estimate for replacement of UNLV campus water line and building isolation valves.
Location: Las Vegas
DI_Location_2: 0
Project Description: The scope of this project is to evaluate existing conditions of the water line infrastructure of the UNLV campus, perform model analysis of the existing water systems, verify the as-built plans of the existing pipelines and modify as needed, document the occupancy and functional program needs of current and future growth, complete the asbestos survey and mapping of the campus old-age transite piping, prepare a report for the UNLV campus water line replacement and building isolation valve installation, and finally complete construction documents. The scope also includes planning for relocation of personnel affected by the service, impacts to the buildings during future construction, development of alternatives, and phasing plans in the report. The report will also evaluate coordination of utility purveyors, construction costs, and metering and connection fees. This project will provide planning for construction, that once completed, will provide greater reliability and service for the campus water lines, sprinkler system, hydrants, and other systems. There will be a positive impact on campus health while providing a more reliable campus water system for drinking water, domestic water, and other water uses.

SPWD Construction Cost Estimate from June 2016


Line Item Cost
1 Water Line Infrastructure Improvements 4,500,000
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Total 4,500,000