View Recomended 2019 CIP Data

SPWD Project Managers have compiled the following data from previous CIP Application Subbmittals. Please review the data, if any adjustments need to be made please contact SPWD.


Application ID: 7587
Project Title: New Loading Dock (Field Maintenance Shop 2)
Agency: NArmyNG
Division: NArmyNG
Department: Military
Project Manager: RLC
Description: Design and construction of a bi-level loading dock at Field Maintenance Shop 2 within the paved area
Location: Stead
DI_Location_2: 0
Project Description: This project includes the demolition of the existing loading dock, and the design and construction of a two level loading dock for loading and unloading of freight, cargo and military vehicles.

SPWD Construction Cost Estimate from June 2016


Line Item Cost
1 Demolition of Existing Dock 25,000
2 Sub Grade Over Excavation of Soils (200 ton @ $30/ton) 6,000
3 Two Level Loading Dock 72,000
4 Rigid Paving (2,000 sf @ $6.5/sf) 13,000
5
6
7
8
9
10
11
12
13
14
15
16
Total 116,000