View Recomended 2019 CIP Data

SPWD Project Managers have compiled the following data from previous CIP Application Subbmittals. Please review the data, if any adjustments need to be made please contact SPWD.


Application ID: 7544
Project Title: Wash Bay Enclosure (Western Regional Headquarters)
Agency: Forestry
Division: Forestry
Department: CNR
Project Manager: RLC
Description: Construction of a 1,200 sf partially enclosed covered wash bay with an enclosed 240 sf equipment space.
Location: Other
DI_Location_2: 0
Project Description: This project includes the design and construction of foundations, three walls and a roof over the existing facilities maintenance wash bay area as well as the demolition and reconstruction of an enclosed 240 sf heated space to house the steam cleaning and air compressor equipment. The existing concrete pad will be evaluated to verify whether it is suitable for the new structural loads that will be imposed by the enclosure.

SPWD Construction Cost Estimate from June 2016


Line Item Cost
1 Foundation & Concrete Slab (1,440 sf @ $15/sf) 21,600
2 Structure / Enclosure (1,440 sf @ $100/sf) 144,000
3 Enclosed Space (240 sf @ $75/sf) 18,000
4 Door & Window 3,500
5 Lighting (1,440 sf @ $5/sf) 7,200
6 Steam Cleaner System 5,800
7 Air Compressor System 6,500
8
9
10
11
12
13
14
15
16
Total 206,600