Application ID: 7362
Project Title: Electrical Upgrade (NNAMHS Building 1)
Agency: NNAMHS
Division: PBH
Department: DHHS
Project Manager: CAD
Description: The scope of this project is a complete electrical upgrade. This includes the main service connection, distribution, switches and receptacles. The fire alarm system, data and phone system and door access system will also be replaced.
Location: Sparks
DI_Location_2: 0
Project Description: The scope of this project will completely upgrade the electrical systems. This includes the main service connection, distribution, switches and receptacles. The fire alarm system, data and phone system and door access system will also be replaced.

SPWD Construction Cost Estimate from June 2016


Line Item Cost
1 Service Entrance & Switch Boards (32,933 sf @ $5/sf) 164,665
2 Lighting Interior & Exterior (32,933 sf @ $6/sf) 197,598
3 Switches & Receptacles (32,933 sf @ $.6/sf) 19,760
4 Mechanical Equipment Connections (32,933 sf @ $1/sf) 32,933
5 Conductors, Boxes & Conduit (32,933 sf @ $7/sf) 230,531
6 Fire Alarm System (32,933 sf @ $2.5/sf) 82,333
7 Telephone & Data (32,933 sf @ $2/sf) 65,866
8 Door Control (32,933 sf @ $1/sf) 32,933
9
10
11
12
13
14
15
16
Total 826,618