Application ID: 7350
Project Title: Electrical Upgrade (NNAMHS Campus)
Agency: NNAMHS
Division: PBH
Department: DHHS
Project Manager: CAD
Description: Project includes transformers, switch gear, vaults, trenching, conduit and conductors.
Location: Sparks
DI_Location_2: 0
Project Description: The scope of this project will provide a complete upgrade and replacement of 4160 volt cable in conduit where direct buried cable is present from the main switchgear, including new transformers trenching and backfill. The project will also include relocating some transformers and panels that are being damaged by a huge sequoia tree, water and rodents.

SPWD Construction Cost Estimate from June 2016


Line Item Cost
1 Trenching, Conduit, Conductor Install (5,280 ft @ $85/ft) 448,800
2 Concrete Pad & Enclosure (12 ea @ $10,000/ea) 120,000
3 Transformers (12 ea @ $50,000/ea) 600,000
4 Switch Gear 75,000
5 Vaults (10 ea @ $10,000/ea) 100,000
6
7
8
9
10
11
12
13
14
15
16
Total 1,343,800