Application ID: 7263
Project Title: Shower Improvements (Humboldt Conservation Camp)
Agency: HCC
Division: HCC
Department: NDOC
Project Manager: RLC
Description: Installation of stainless shower enclosures in the housing units
Location: Winnemucca
DI_Location_2: 0
Project Description: This project includes the design and installation of 24 stainless steel shower enclosures at the existing shower units. The shower floors will also be replaced.

SPWD Construction Cost Estimate from June 2016


Line Item Cost
1 Demolition 8,500
2 Wall Repairs & Preparation 15,000
3 Stainless Steel Enclosures (15 ea @ $19,260/ea) 288,900
4 Poured Shower Floors (450 sf @ $40/sf) 18,000
5 Shower Head & Controls (15 ea @ $850/ea) 12,750
6
7
8
9
10
11
12
13
14
15
16
Total 343,150