View Recomended 2019 CIP Data

SPWD Project Managers have compiled the following data from previous CIP Application Subbmittals. Please review the data, if any adjustments need to be made please contact SPWD.


Application ID: 7250
Project Title: Extend Display Pavilion (Boulder City Railroad Museum)
Agency: RR_Mus
Division: MusHist
Department: T&CultAffr
Project Manager: CSB
Description: Extend display pavilion 200' long X 50' wide with concrete walkway.
Location: Boulder City
DI_Location_2: 0
Project Description: The scope of this project is to build a 50 feet wide, 200 feet long pre-engineered metal building extension display pavilion at the Boulder City Railroad Museum. The display pavilion is an open sided building installed over two existing railroad tracks with new concrete walkway between the tracks. Once completed, pavilion will provide a needed shaded area for the passenger cars and the rail road museum exhibits.

SPWD Construction Cost Estimate from June 2016


Line Item Cost
1 Steel Bldg 200' X 50' (10,000 sf @ $45/sf) 450,000
2 Concrete Walkway 4" Thick, 10' X 200' (2,000 sf @ $8/sf) 16,000
3 Chain Link Fence 4' High X 200' Long (200 lf @ $12/lf) 2,400
4 Selective Demolition 5,000
5
6
7
8
9
10
11
12
13
14
15
16
Total 473,400