View Recomended 2019 CIP Data

SPWD Project Managers have compiled the following data from previous CIP Application Subbmittals. Please review the data, if any adjustments need to be made please contact SPWD.


Application ID: 7206
Project Title: Advance Planning: Central Plant Renovation (State Library and Archives)
Agency: B&G
Division: SPWD
Department: Admin
Project Manager: DBN
Description: Advance planning through construction documents for replacement of existing chillers, boilers, pumps, piping, and related controls.
Location: Carson City
DI_Location_2: 0
Project Description: The scope of work for this project includes advance planning through construction documents for a complete renovation of the existing central plant (heating and cooling equipment). The project will include replacing the existing chillers, boilers, pumps, piping, and related controls. The existing cooling tower and plate heat exchanger were replaced in 2011 as part of another project (09-M01). Because of the significant space constraints in the existing mechanical rooms, potential issues with routing the new boiler flues, and potential chiller room code issues, this is being recommended as a planning project.

SPWD Construction Cost Estimate from June 2016


Line Item Cost
1 Water-Cooled Chillers (120 ton) (2 ea @ $150,000/ea) 300,000
2 Chilled Water Pumps, Piping, & Accessories 180,000
3 Chiller Room Code Modifications 60,000
4 Boilers (1500 mbh) (3 ea @ $50,000/ea) 150,000
5 Heating Water Pumps, Piping, & Accessories 170,000
6 Boiler Room Code Modifications 60,000
7 Demolition of Existing Equipment & Piping 17,000
8 Crane/Rigging 5,000
9 Temperature Control System Modifications 175,000
10 Electrical Modifications 20,000
11 Testing, Balancing, & Commissioning 16,000
12 Flushing, Cleaning, & Chemical Treatment 7,000
13
14
15
16
Total 1,160,000