Application ID: 7188
Project Title: HVAC Systems Re-Commissioning (Various NDOC Locations)
Agency: NDOC
Division: NDOC
Department: NDOC
Project Manager: DBN
Description: HVAC systems re-commissioning for major buildings at three NDOC sites (HDSP, SDCC, and ESP).
Location: Various
DI_Location_2: 0
Project Description: The scope of work for this project is to conduct re-commissioning efforts at three Department of Corrections facilities (High Desert State Prison, Southern Desert Correctional Center, and Ely State Prison). The work would include a re-assessment of the temperature control system programming and setpoints, a re-assessment of air and water flows at major pieces of equipment, and corrective actions on a prioritized list of mechanical issues that are observed during the overall re-commissioning effort.

SPWD Construction Cost Estimate from June 2016


Line Item Cost
1 Temperature Control Modifications (3 ea @ $21,600/ea) 64,800
2 Testing & Balancing Modifications (3 ea @ $9,600/ea) 28,800
3 Mechanical Systems Modifications (3 ea @ $15,000/ea) 45,000
4 Third Party Commissioning (3 ea @ $10,800/ea) 32,400
5
6
7
8
9
10
11
12
13
14
15
16
Total 171,000