Application ID: 7136
Project Title: Shoreline Power and Lighting (Big Bend State Park)
Agency: Parks
Division: Parks
Department: CNR
Project Manager: CAD
Description: Provide shoreline power and lighting at Big Bend State Park.
Location: Laughlin
DI_Location_2: 0
Project Description: This project is to install power and lighting to the shoreline area of this park. It would also provide power for vehicle charging, as well as restroom lighting. It provides lighting for the south area of the beach and boat ramp.

SPWD Construction Cost Estimate from June 2016


Line Item Cost
1 500 KVA Transformers (2 ea @ $34,000/ea) 68,000
2 High Voltage Conductor (2,500 lf @ $35/lf) 87,500
3 400 Amp Breaker 4,000
4 400 Amp Distribution Panel 10,000
5 Pole Lighting (10 ea @ $7,000/ea) 70,000
6 Power Pedestals (4 ea @ $1,200/ea) 4,800
7 Low Voltage Trench, Conduit & Conductor (1,100 lf @ $75/lf) 82,500
8 Distribution Transformer 22,000
9 Low Voltage Distribution Panel 4,000
10 Restroom Lighting 2,000
11
12
13
14
15
16
Total 354,800