Application ID: 7124
Project Title: Remodel Shower Enclosures (Lovelock Correctional Center)
Agency: LCC
Division: LCC
Department: NDOC
Project Manager: RLC
Description: Install stainless steel shower enclosures in all housing units.
Location: Lovelock
DI_Location_2: 0
Project Description: This project includes the design and construction to refurbish the showers in all 6 housing units (120 showers). The work includes replacing each stall with a stainless steel enclosure, replace trim, and install nozzles for low water use. The project will be completed in phases where one half of a unit's showers are being renovated.

SPWD Construction Cost Estimate from June 2016


Line Item Cost
1 Demolition / Wall Prep (120 ea @ $2,500/ea) 300,000
2 Stainless Enclosures (120 ea @ $18,000/ea) 2,160,000
3 Epoxy Flooring (120 ea @ $1,500/ea) 180,000
4 Shower Heads & Valve (120 ea @ $1,200/ea) 144,000
5
6
7
8
9
10
11
12
13
14
15
16
Total 2,784,000