Application ID: 7095
Project Title: Rehabilitation & Restoration of Adobe Ruins (Fort Churchill State Park)
Agency: Parks
Division: Parks
Department: CNR
Project Manager: RMO
Description: Rehabilitate and restore the adobe building structure ruins.
Location: Fallon
DI_Location_2: 0
Project Description: The scope of this project is to rehabilitate and restore a portion of the adobe ruins at Fort Churchill State Historic Park. This work needs to conform to SHPO requirements. Although these ruins were re-created, they need to be historically accurate. This project would restore and/or replace adobe bricks that have deteriorated over time. This project includes a stabilization agent to reduce the speed at which the adobe bricks deteriorate.

SPWD Construction Cost Estimate from June 2016


Line Item Cost
1 Adobe Masonry Wall Repair (1,581 sf @ $60/sf) 94,860
2 Plaster on Adobe Wall (12,407 sf @ $28/sf) 347,396
3 Reconstruct Adobe Walls (706 sf @ $120/sf) 84,720
4 Excavate at Building Perimeter (10,410 sf @ $12/sf) 124,920
5 Coping / Top of Wall Repair (1,292 lf @ $24/lf) 31,008
6
7
8
9
10
11
12
13
14
15
16
Total 682,904