1. Project Name: Asbestos and lead paint mitigation from large objects [locomotives] at Nevada State Railroad Museum, Boulder City
2. Project Description (One Sentence): Project would securely and safely remove asbestos from historic artifacts, locomotives, at the Nevada State Railroad Museum in Boulder City.
3a. Project Location: County: Clark
3b. Project Location: City: Boulder City
4. Department (department requesting project): Cultural Affairs
5. Division (division requesting project): Museums & History
6. Agency (agency requesting project): Railroad Museum
7. Agency contact person: Randy Hees
8. Contact phone: 702-486-5952
9. Contact email: rhees@nevadaculture.org
The Department ranking of this project:
10. The Department will rank their projects 1 through the lowest ranked project (e.g., If 5 projects were submitted by the Department a ranking of 1 would be assigned to the most important or most needed project and a ranking of 5 would be the least needed project). 4
11. Has this project been previously requested in a prior CIP? No
12. SPWD 4 digit Building No. (for existing buildings) 9951
13. Facility Condition Analysis Project No. (if recommended) N/A
14. Is the property State Owned? Yes
15. If the facility is existing, is it State owned? Yes
II. Narrative Section 
16. Project Description: Historically steam locomotive fireboxes and boilers were wrapped in 4" to 6" of asbestos lagging, this to improve machine efficiency. Over the course of decades of exposure to the elements the asbestos has broken down and now weeps to the ground, creating a significant health and life safety hazard.
17. Project Justification: This project would create localized containment for the removal and safe disposal of friable asbestos found in locomotives in the collection of the Nevada State Railroad Museum in Boulder City. Removal of asbestos allows for cosmetic and mechanical restoration and access by the public.
18. Project Background Information: Locomotives acquired in the past were not screened for asbestos. Over time the breakdown of the lagging has created a health risk to staff, volunteers and the public.
19. Mechanical and/or Electrical Equipment Replacement Projects:
19a. Type of equipment to be replaced:
19b. Year existing equipment was installed:
19c. Manufacturer of existing equipment:
19d. Model of existing equipment:
19e. Are there any known hazardous materials? Yes
Environmental Considerations
20a. Hazardous Materials (Asbestos, Lead Paint, etc.): Asbestos, possible lead paint.
20b. Will the site require any hazardous material abatement? Yes
21. Ramifications if the Project is not Approved (short essay): The continued release of friable asbestos into the environment creates significant risks.
Health, Life Safety, and/or Legal Issues
22. Please describe any health, life safety, and/or legal issues that will be resolved by completing this project (Short Essay): Removal of the asbestos and mitigation of lead paint allows the museum to be in compliance with various federal and state laws and allows for eventual access of the artifacts by the public we serve.
23. Proposed Project Schedule Impacts/Issues
23a. Will this project require relocating personnel or vacating the building for any period of time? No
23b. Explain:
23c. Has any design work been completed on the proposed project? No
23d. What is the latest date this project could be completed without disrupting your program? 12/31/2019
23e. What is the driving proposed completion date? Elevation of health and life safety risk as the situation continues unabated.
III. Preliminary Construction Cost Estimate and Funding Sources Section 
Preliminary Construction Cost Estimate and Funding Sources (The SPWD will prepare all final cost estimates. This schedule is for preliminary purposes only.)
24. Land (if land must be purchased):
25. Offsite construction:
26. On-site Development:
27. Utility connection fees:
28. Water rights deeded:
29. Furniture, Fixtures and Equipment:
30. Specialty equipment:
31. Data and network equipment:
32. Telephone equipment costs:
33. Moving:
34. Renovation of vacated space:
35a. Correction of known deficiencies:
35b. (describe deficiencies)
36a. Any known commitments:
36b. (describe commitments)
37a. Known hazardous material abatement: 400,000
37b. (describe hazardous materials) Asbestos and lead paint contamination.
38. Total project costs: 400,000
NOTE: COSTS FOR EXTENDED LEASE AGREEMENTS MUST BE INCLUDED IN YOUR OPERATING BUDGET
39. Proposed funding of total project cost:
39a. Agency:
39b. Federal
39c. State 400,000
39d. Other/Donor
39e. (describe source of 'Other/ Donor' funding):
39f. Total: 400,000
40. Agency point of contact for outisde funding if 39a, 39b, or 39c funding sources are providing funds.
40a. Name
40b. Phone Number
40c. Email Address
IV. Site Analysis Section 
Site Analysis (New construction only)
41. Estimated land area to be acquired (acres)
42. Will this project require new parking spaces?
43. Are utilities available to site?
44. Will project require relocation of existing utilities?
45. Are there any required offsite improvements (or right-of-way dedications)?
46. Is the site in a flood plain?
47. Is the site in an airport impact zone?
48. Does the site contain any underground storage tanks?
49. Does the site contain any adverse soil conditions?
50. Will the site require an environmental assessment?
51. Will rezoning or a special use permit be required?
52. Will any Utility connection fees need to be paid?
53. Will any water rights need to be deeded?
54. Will construction traffic degrade existing access or facilities?
55. Will the site require any hazardous material abatement?
56a. Other site considerations affecting cost? (describe):
56b. Describe Site Considerations:
V. Programming Section 
Programming (New construction, building remodels, and building additions only)
57. Has any architectural programming occurred?
(Programming is an architectural definition of the needs/problems that must be addressed by the project)
58. Has any advanced planning occurred in previous CIPs?
59. Usable Square footage required (including storage space)
59a. New Construction SF:
59b. Remodel/Renovation SF:
59c. Addition SF
59d.Total project SF:
60. Occupancy type (Assembly, business, educational, factory/industrial, high hazard, institutional, mercantile, residential, storage, utility/miscellaneous) :
61. Approximate number of staff to occupy facility:
62. Approximate number of visitors per day:
63. Will this project require funding for any furnishings, fixtures and equipment?
64. For existing facilities, are there any known hazardous materials? (e.g., Asbestos, lead paint or underground storage tanks):
65. How many years of future growth will this project accommodate?
66. List of required facilites (laboratory space, classroom space, office space, conference rooms, cafeterias, maintenance shops, garages) and any unusual related equipment required for your project:

Submit


NOTE:  IF YOU ARE THE “AGENCY CONTACT PERSON”, AND HAVE NOT BEEN CONTACTED BY THE ASSIGNED PROJECT MANAGER BY APRIL 16, 2018, PLEASE CONTACT THEM.