Submitted Application for a 2019 CIP Project

AppID19155
I. Administrative Section 
1. Project Name: NDA Las Vegas Warehouse Expansion Building
2. Project Description (One Sentence): Provide cold and dry storage for Food Commodities program and space for other programs.
3a. Project Location: County: Clark
3b. Project Location: City: Las Vegas
4. Department (department requesting project): Agriculture
5. Division (division requesting project):
6. Agency (agency requesting project):
7. Agency contact person: mike geissinger
8. Contact phone: 775-353-3727
9. Contact email: mgeissinger@agri.nv.gov
The Department ranking of this project:
10. The Department will rank their projects 1 through the lowest ranked project (e.g., If 5 projects were submitted by the Department a ranking of 1 would be assigned to the most important or most needed project and a ranking of 5 would be the least needed project). 1
11. Has this project been previously requested in a prior CIP? No
12. SPWD 4 digit Building No. (for existing buildings)
13. Facility Condition Analysis Project No. (if recommended)
14. Is the property State Owned? Yes
15. If the facility is existing, is it State owned?
II. Narrative Section 
16. Project Description: To construct a warehouse in the current NDA parking lot in Las Vegas that would have freezer, refrigeration and dry storage for foods collected and awaiting shipment for such programs as :National School Lunch, Child and Adult Care, Commodity Supplemental Foods, etc. Also provide space for a maintenance garage and laboratory space for Dairy, Plant and Animal programs.
17. Project Justification: NDA currently leases cold storage space in Las Vegas. This adds costs to the programs, extra wear and tear on trucks and employees, inefficiency on times spent unloading and loading from a different location than our dry storage, and issues with inventory control.
18. Project Background Information:
19. Mechanical and/or Electrical Equipment Replacement Projects:
19a. Type of equipment to be replaced:
19b. Year existing equipment was installed:
19c. Manufacturer of existing equipment:
19d. Model of existing equipment:
19e. Are there any known hazardous materials?
Environmental Considerations
20a. Hazardous Materials (Asbestos, Lead Paint, etc.):
20b. Will the site require any hazardous material abatement? Unknown
21. Ramifications if the Project is not Approved (short essay):
Health, Life Safety, and/or Legal Issues
22. Please describe any health, life safety, and/or legal issues that will be resolved by completing this project (Short Essay):
23. Proposed Project Schedule Impacts/Issues
23a. Will this project require relocating personnel or vacating the building for any period of time? No
23b. Explain:
23c. Has any design work been completed on the proposed project? Unknown
23d. What is the latest date this project could be completed without disrupting your program?
23e. What is the driving proposed completion date?
III. Preliminary Construction Cost Estimate and Funding Sources Section 
Preliminary Construction Cost Estimate and Funding Sources (The SPWD will prepare all final cost estimates. This schedule is for preliminary purposes only.)
24. Land (if land must be purchased): 0
25. Offsite construction: 0
26. On-site Development: unknown
27. Utility connection fees: unknown
28. Water rights deeded:
29. Furniture, Fixtures and Equipment: unknown
30. Specialty equipment: unknown
31. Data and network equipment: unknown
32. Telephone equipment costs: unknown
33. Moving: 0
34. Renovation of vacated space: 0
35a. Correction of known deficiencies:
35b. (describe deficiencies)
36a. Any known commitments:
36b. (describe commitments)
37a. Known hazardous material abatement:
37b. (describe hazardous materials)
38. Total project costs: 5,760,000.
NOTE: COSTS FOR EXTENDED LEASE AGREEMENTS MUST BE INCLUDED IN YOUR OPERATING BUDGET
39. Proposed funding of total project cost:
39a. Agency:
39b. Federal
39c. State 5,760,000.
39d. Other/Donor
39e. (describe source of 'Other/ Donor' funding):
39f. Total: 5,760,000.
40. Agency point of contact for outisde funding if 39a, 39b, or 39c funding sources are providing funds.
40a. Name
40b. Phone Number
40c. Email Address
IV. Site Analysis Section 
Site Analysis (New construction only)
41. Estimated land area to be acquired (acres) 0
42. Will this project require new parking spaces? No
43. Are utilities available to site? Unknown
44. Will project require relocation of existing utilities? Unknown
45. Are there any required offsite improvements (or right-of-way dedications)? Unknown
46. Is the site in a flood plain? Unknown
47. Is the site in an airport impact zone? No
48. Does the site contain any underground storage tanks? Unknown
49. Does the site contain any adverse soil conditions? Unknown
50. Will the site require an environmental assessment? Unknown
51. Will rezoning or a special use permit be required? Unknown
52. Will any Utility connection fees need to be paid? Yes
53. Will any water rights need to be deeded? Unknown
54. Will construction traffic degrade existing access or facilities? Unknown
55. Will the site require any hazardous material abatement? Unknown
56a. Other site considerations affecting cost? (describe): Unknown
56b. Describe Site Considerations: The chosen footprint site for the building is on the current NDA fenced grounds in the southern portion of the grounds which is unused for parking.
V. Programming Section 
Programming (New construction, building remodels, and building additions only)
57. Has any architectural programming occurred?
(Programming is an architectural definition of the needs/problems that must be addressed by the project)
58. Has any advanced planning occurred in previous CIPs? Unknown
59. Usable Square footage required (including storage space)
59a. New Construction SF: 14,400
59b. Remodel/Renovation SF:
59c. Addition SF
59d.Total project SF: 14,400
60. Occupancy type (Assembly, business, educational, factory/industrial, high hazard, institutional, mercantile, residential, storage, utility/miscellaneous) : Storage
61. Approximate number of staff to occupy facility: 6
62. Approximate number of visitors per day: 3
63. Will this project require funding for any furnishings, fixtures and equipment? Yes
64. For existing facilities, are there any known hazardous materials? (e.g., Asbestos, lead paint or underground storage tanks):
65. How many years of future growth will this project accommodate? 25
66. List of required facilites (laboratory space, classroom space, office space, conference rooms, cafeterias, maintenance shops, garages) and any unusual related equipment required for your project: drive-in refrigerator and freezer. maintenance shop. laboratory space. office space