Submitted Application from prior CIP Planning Cycle

AppID7596g
I. Administrative Section 
1. Project Name: Replace cracked sidewalks at Elko County Readiness Center
2. Project Description (One Sentence): replace cracked and damaged sidewalks at carlin facility.
3a. Project Location: County: Elko
3b. Project Location: City: Carlin
4. Department (department requesting project): Military
5. Division (division requesting project): Nevada Army National Guard
6. Agency (agency requesting project):
7. Agency contact person: Johannes Lamprecht
8. Contact phone: 7758877290
9. Contact email: johannes.f.lamprecht.mil@mail.mil
The Department ranking of this project:
10. The Department will rank their projects 1 through the lowest ranked project (e.g., If 5 projects were submitted by the Department a ranking of 1 would be assigned to the most important or most needed project and a ranking of 5 would be the least needed project). 20
11. Has this project been previously requested in a prior CIP? No
12. SPWD 4 digit Building No. (for existing buildings) 2951
13. Facility Condition Analysis Project No. (if recommended)
14. Is the property State Owned? Yes
15. If the facility is existing, is it State owned? Yes
II. Narrative Section 
16. Project Description: The sidewalks at the Elko County Readiness Center (old fire science academy) have deteriorated significantly due to age, climate and substandard concrete. The NVARNG request the removal and replacement of the failing sidewalks located on this campus. NVARNG would also like to request that all fees from the NV SPWD to include project management and inspection be paid for by the state.
17. Project Justification: The sidewalks at the Elko County Readiness Center (old fire science academy) have deteriorated significantly due to age, climate and substandard concrete and could eventually cause safety and drainage issues if left uncorrected.
18. Project Background Information: The sidewalks at the Elko County Readiness Center (old fire science academy) have deteriorated significantly due to age, climate and substandard concrete.
19. Mechanical and/or Electrical Equipment Replacement Projects:
19a. Type of equipment to be replaced: na
19b. Year existing equipment was installed: na
19c. Manufacturer of existing equipment: na
19d. Model of existing equipment: na
19e. Are there any known hazardous materials? Unknown
Environmental Considerations
20a. Hazardous Materials (Asbestos, Lead Paint, etc.):
20b. Will the site require any hazardous material abatement? No
21. Ramifications if the Project is not Approved (short essay): The sidewalks at the Elko County Readiness Center (old fire science academy) have deteriorated significantly due to age, climate and substandard concrete and could eventually cause safety and drainage issues if left uncorrected.
Health, Life Safety, and/or Legal Issues
22. Please describe any health, life safety, and/or legal issues that will be resolved by completing this project (Short Essay): The sidewalks at the Elko County Readiness Center (old fire science academy) have deteriorated significantly due to age, climate and substandard concrete and could eventually cause safety and drainage issues if left uncorrected.
23. Proposed Project Schedule Impacts/Issues
23a. Will this project require relocating personnel or vacating the building for any period of time? No
23b. Explain:
23c. Has any design work been completed on the proposed project? No
23d. What is the latest date this project could be completed without disrupting your program? Nov 2019
23e. What is the driving proposed completion date? The damage is worsened by change in temperature and will continue to deteriorate from the constant freeze/ thaw cycles known for that region of NV
III. Preliminary Construction Cost Estimate and Funding Sources Section 
Preliminary Construction Cost Estimate and Funding Sources (The SPWD will prepare all final cost estimates. This schedule is for preliminary purposes only.)
24. Land (if land must be purchased): na
25. Offsite construction: na
26. On-site Development: na
27. Utility connection fees: na
28. Water rights deeded: na
29. Furniture, Fixtures and Equipment: na
30. Specialty equipment: na
31. Data and network equipment: na
32. Telephone equipment costs: na
33. Moving: na
34. Renovation of vacated space: na
35a. Correction of known deficiencies: 50000
35b. (describe deficiencies) The sidewalks at the Elko County Readiness Center (old fire science academy) have deteriorated significantly due to age, climate and substandard concrete and could eventually cause safety and drainage issues if left uncorrected. Deficiencies include tortoise shelling, cracking and crumbling.
36a. Any known commitments:
36b. (describe commitments)
37a. Known hazardous material abatement:
37b. (describe hazardous materials)
38. Total project costs: 50000
NOTE: COSTS FOR EXTENDED LEASE AGREEMENTS MUST BE INCLUDED IN YOUR OPERATING BUDGET
39. Proposed funding of total project cost:
39a. Agency:
39b. Federal 10000
39c. State 40000
39d. Other/Donor
39e. (describe source of 'Other/ Donor' funding):
39f. Total: 50000
40. Agency point of contact for outisde funding if 39a, 39b, or 39c funding sources are providing funds.
40a. Name Johannes Lamprecht
40b. Phone Number 7758877290
40c. Email Address johannes.f.lamprecht.mil@mail.mil
IV. Site Analysis Section 
Site Analysis (New construction only)
41. Estimated land area to be acquired (acres) na
42. Will this project require new parking spaces? No
43. Are utilities available to site? Yes
44. Will project require relocation of existing utilities? No
45. Are there any required offsite improvements (or right-of-way dedications)? No
46. Is the site in a flood plain? No
47. Is the site in an airport impact zone? No
48. Does the site contain any underground storage tanks? No
49. Does the site contain any adverse soil conditions? No
50. Will the site require an environmental assessment? No
51. Will rezoning or a special use permit be required? No
52. Will any Utility connection fees need to be paid? No
53. Will any water rights need to be deeded? No
54. Will construction traffic degrade existing access or facilities? No
55. Will the site require any hazardous material abatement? No
56a. Other site considerations affecting cost? (describe): No
56b. Describe Site Considerations: Existing National Guard facility. Hours of operation are 0730 to 5 pm. Background check will be required for contractors and vendors to have access to site.
V. Programming Section 
Programming (New construction, building remodels, and building additions only)
57. Has any architectural programming occurred?
(Programming is an architectural definition of the needs/problems that must be addressed by the project)
58. Has any advanced planning occurred in previous CIPs? No
59. Usable Square footage required (including storage space)
59a. New Construction SF:
59b. Remodel/Renovation SF: 3000
59c. Addition SF
59d.Total project SF: 3000
60. Occupancy type (Assembly, business, educational, factory/industrial, high hazard, institutional, mercantile, residential, storage, utility/miscellaneous) : Business
61. Approximate number of staff to occupy facility: 6
62. Approximate number of visitors per day: 8
63. Will this project require funding for any furnishings, fixtures and equipment? No
64. For existing facilities, are there any known hazardous materials? (e.g., Asbestos, lead paint or underground storage tanks): No
65. How many years of future growth will this project accommodate? 25
66. List of required facilites (laboratory space, classroom space, office space, conference rooms, cafeterias, maintenance shops, garages) and any unusual related equipment required for your project:

Submit