Submitted Application from prior CIP Planning Cycle

AppID7553
I. Administrative Section 
1. Project Name: Humboldt CC Restroom Addition & ADA Compliance
2. Project Description (One Sentence): This project will include the construction of one new ADA compliant bathroom with shower stall and adding a shower stall to the existing unisex bathroom at this location.
3a. Project Location: County: Humbolt
3b. Project Location: City: Winnemucca
4. Department (department requesting project): CNR
5. Division (division requesting project): Forestry
6. Agency (agency requesting project): N/A
7. Agency contact person: Brett Simerly
8. Contact phone: 775-684-2517
9. Contact email: bsimerly@forestry.nv.gov
The Department ranking of this project:
10. The Department will rank their projects 1 through the lowest ranked project (e.g., If 5 projects were submitted by the Department a ranking of 1 would be assigned to the most important or most needed project and a ranking of 5 would be the least needed project). SWA 37
11. Has this project been previously requested in a prior CIP? No
12. SPWD 4 digit Building No. (for existing buildings) 1605
13. Facility Condition Analysis Project No. (if recommended)
14. Is the property State Owned? Yes
15. If the facility is existing, is it State owned? Yes
II. Narrative Section 
16. Project Description: This project would include construction of one new ADA compliant restroom with shower stall and adding a shower stall to the existing unisex bathroom at this location.
17. Project Justification: This project needs to be approved to help with overcrowding of the facilities single toilet and sink restroom and to bring the facility into ADA compliance. Additionally this project will add two new showers which will allow for the removal of herbicide residue which personnel can be exposed to during project work.
18. Project Background Information: No ADA access is available and overcrowding of the single toilet and sink. Additionally there are no shower facilities at this location to allow for the removal of herbicide residue which personnel can be exposed to during project work.
19. Mechanical and/or Electrical Equipment Replacement Projects:
19a. Type of equipment to be replaced:
19b. Year existing equipment was installed:
19c. Manufacturer of existing equipment:
19d. Model of existing equipment:
19e. Are there any known hazardous materials?
Environmental Considerations
20a. Hazardous Materials (Asbestos, Lead Paint, etc.):
20b. Will the site require any hazardous material abatement? Unknown
21. Ramifications if the Project is not Approved (short essay): If this project is not approved the agency can be cited for noncompliance with ADA laws and exposes employees to unhealthy conditions with overcrowding and lack of shower facilities.
Health, Life Safety, and/or Legal Issues
22. Please describe any health, life safety, and/or legal issues that will be resolved by completing this project (Short Essay): If this project is not approved the agency can be cited for noncompliance with ADA laws and exposes employees to unhealthy conditions with overcrowding and lack of shower facilities.
23. Proposed Project Schedule Impacts/Issues
23a. Will this project require relocating personnel or vacating the building for any period of time? No
23b. Explain:
23c. Has any design work been completed on the proposed project? Unknown
23d. What is the latest date this project could be completed without disrupting your program? 6/30/18
23e. What is the driving proposed completion date? Lack of ADA compliance, lack of showers, and unhealthy overcrowding of restroom facilities.
III. Preliminary Construction Cost Estimate and Funding Sources Section 
Preliminary Construction Cost Estimate and Funding Sources (The SPWD will prepare all final cost estimates. This schedule is for preliminary purposes only.)
24. Land (if land must be purchased):
25. Offsite construction:
26. On-site Development:
27. Utility connection fees:
28. Water rights deeded:
29. Furniture, Fixtures and Equipment:
30. Specialty equipment:
31. Data and network equipment:
32. Telephone equipment costs:
33. Moving:
34. Renovation of vacated space:
35a. Correction of known deficiencies: 70000
35b. (describe deficiencies) Lack of ADA compliance and unhealthy overcrowding of restroom facilities needs to be addressed to create a safer more healthful environment for state personnel.
36a. Any known commitments:
36b. (describe commitments)
37a. Known hazardous material abatement:
37b. (describe hazardous materials)
38. Total project costs: 70000
NOTE: COSTS FOR EXTENDED LEASE AGREEMENTS MUST BE INCLUDED IN YOUR OPERATING BUDGET
39. Proposed funding of total project cost:
39a. Agency:
39b. Federal
39c. State 70000
39d. Other/Donor
39e. (describe source of 'Other/ Donor' funding):
39f. Total: 70000
40. Agency point of contact for outisde funding if 39a, 39b, or 39c funding sources are providing funds.
40a. Name
40b. Phone Number
40c. Email Address
IV. Site Analysis Section 
Site Analysis (New construction only)
41. Estimated land area to be acquired (acres)
42. Will this project require new parking spaces?
43. Are utilities available to site?
44. Will project require relocation of existing utilities?
45. Are there any required offsite improvements (or right-of-way dedications)?
46. Is the site in a flood plain?
47. Is the site in an airport impact zone?
48. Does the site contain any underground storage tanks?
49. Does the site contain any adverse soil conditions?
50. Will the site require an environmental assessment?
51. Will rezoning or a special use permit be required?
52. Will any Utility connection fees need to be paid?
53. Will any water rights need to be deeded?
54. Will construction traffic degrade existing access or facilities?
55. Will the site require any hazardous material abatement?
56a. Other site considerations affecting cost? (describe):
56b. Describe Site Considerations:
V. Programming Section 
Programming (New construction, building remodels, and building additions only)
57. Has any architectural programming occurred?
(Programming is an architectural definition of the needs/problems that must be addressed by the project)
58. Has any advanced planning occurred in previous CIPs?
59. Usable Square footage required (including storage space)
59a. New Construction SF:
59b. Remodel/Renovation SF:
59c. Addition SF
59d.Total project SF:
60. Occupancy type (Assembly, business, educational, factory/industrial, high hazard, institutional, mercantile, residential, storage, utility/miscellaneous) :
61. Approximate number of staff to occupy facility:
62. Approximate number of visitors per day:
63. Will this project require funding for any furnishings, fixtures and equipment?
64. For existing facilities, are there any known hazardous materials? (e.g., Asbestos, lead paint or underground storage tanks):
65. How many years of future growth will this project accommodate?
66. List of required facilites (laboratory space, classroom space, office space, conference rooms, cafeterias, maintenance shops, garages) and any unusual related equipment required for your project:

Submit


NOTE:  AFTER SUBMITTING THE COMPLETED APPLICATION, A PROJECT MANAGER FROM THE PUBLIC WORKS DIVISION WILL CONTACT YOU TO REVIEW THIS APPLICATION.