Submitted Application from prior CIP Planning Cycle

AppID7385
I. Administrative Section 
1. Project Name: NNAMHS- surface irrigation project
2. Project Description (One Sentence): A project to use existing water rights to the Truckee River and campus well water for various irrigation projects.
3a. Project Location: County: Washoe
3b. Project Location: City: Sparks
4. Department (department requesting project): DHHS
5. Division (division requesting project): Public & Behavioral Health
6. Agency (agency requesting project): NNAMHS
7. Agency contact person: Kurt Green
8. Contact phone: 775-688-2030
9. Contact email: kgreen@health.nv.gov
The Department ranking of this project:
10. The Department will rank their projects 1 through the lowest ranked project (e.g., If 5 projects were submitted by the Department a ranking of 1 would be assigned to the most important or most needed project and a ranking of 5 would be the least needed project). 126
11. Has this project been previously requested in a prior CIP?
12. SPWD 4 digit Building No. (for existing buildings) 9985
13. Facility Condition Analysis Project No. (if recommended)
14. Is the property State Owned? Yes
15. If the facility is existing, is it State owned? Yes
II. Narrative Section 
16. Project Description: This project will utilize existing state water rights for campus irrigation projects and the future development of adjacent state owned lands. The project will explore renewing the pump house at the river and utilizing an existing well used by the old heat plant for boiler water.
17. Project Justification: The campus irrigation system is old and deteriorated, the system loses large amounts of water at a considerable expense. The current irrigation system is unable to provide responsible service and alternative water resources should be used. The new irrigation system will provide the campus and any future development of the vast area of land owned by the state adjacent to the campus with ample water, free from monthly usage charges.
18. Project Background Information: The campus asylum was founded in the late 1800's and utilized flood irrigation from the Truckee River for the (quite successful) self sufficient farm managed by the university. The remnant of this system still exists today as the water trenches and pump house are still viewable.
19. Mechanical and/or Electrical Equipment Replacement Projects:
19a. Type of equipment to be replaced: New pump house and water delivery system
19b. Year existing equipment was installed: Late 1800's
19c. Manufacturer of existing equipment: n/a
19d. Model of existing equipment: n/a
19e. Are there any known hazardous materials? Unknown
Environmental Considerations
20a. Hazardous Materials (Asbestos, Lead Paint, etc.):
20b. Will the site require any hazardous material abatement? Unknown
21. Ramifications if the Project is not Approved (short essay): The campus will continue to lose vast quantities of water utilizing the current irrigation system and loss of water will continue to needlessly cost the state excessive amounts of time and money.
Health, Life Safety, and/or Legal Issues
22. Please describe any health, life safety, and/or legal issues that will be resolved by completing this project (Short Essay): The entire community will benefit from the savings of water resources that will be realized as the result of responsible water management.
23. Proposed Project Schedule Impacts/Issues
23a. Will this project require relocating personnel or vacating the building for any period of time? Unknown
23b. Explain:
23c. Has any design work been completed on the proposed project? No
23d. What is the latest date this project could be completed without disrupting your program? 06/30/18
23e. What is the driving proposed completion date? The availability of funding and the need to responsibly use precious water resources.
III. Preliminary Construction Cost Estimate and Funding Sources Section 
Preliminary Construction Cost Estimate and Funding Sources (The SPWD will prepare all final cost estimates. This schedule is for preliminary purposes only.)
24. Land (if land must be purchased):
25. Offsite construction:
26. On-site Development:
27. Utility connection fees:
28. Water rights deeded:
29. Furniture, Fixtures and Equipment:
30. Specialty equipment:
31. Data and network equipment:
32. Telephone equipment costs:
33. Moving:
34. Renovation of vacated space:
35a. Correction of known deficiencies:
35b. (describe deficiencies)
36a. Any known commitments:
36b. (describe commitments)
37a. Known hazardous material abatement:
37b. (describe hazardous materials)
38. Total project costs: 600,000
NOTE: COSTS FOR EXTENDED LEASE AGREEMENTS MUST BE INCLUDED IN YOUR OPERATING BUDGET
39. Proposed funding of total project cost:
39a. Agency:
39b. Federal
39c. State
39d. Other/Donor
39e. (describe source of 'Other/ Donor' funding):
39f. Total:
40. Agency point of contact for outisde funding if 39a, 39b, or 39c funding sources are providing funds.
40a. Name
40b. Phone Number
40c. Email Address
IV. Site Analysis Section 
Site Analysis (New construction only)
41. Estimated land area to be acquired (acres)
42. Will this project require new parking spaces?
43. Are utilities available to site?
44. Will project require relocation of existing utilities?
45. Are there any required offsite improvements (or right-of-way dedications)?
46. Is the site in a flood plain?
47. Is the site in an airport impact zone?
48. Does the site contain any underground storage tanks?
49. Does the site contain any adverse soil conditions?
50. Will the site require an environmental assessment?
51. Will rezoning or a special use permit be required?
52. Will any Utility connection fees need to be paid?
53. Will any water rights need to be deeded?
54. Will construction traffic degrade existing access or facilities?
55. Will the site require any hazardous material abatement?
56a. Other site considerations affecting cost? (describe):
56b. Describe Site Considerations:
V. Programming Section 
Programming (New construction, building remodels, and building additions only)
57. Has any architectural programming occurred?
(Programming is an architectural definition of the needs/problems that must be addressed by the project)
58. Has any advanced planning occurred in previous CIPs?
59. Usable Square footage required (including storage space)
59a. New Construction SF:
59b. Remodel/Renovation SF:
59c. Addition SF
59d.Total project SF:
60. Occupancy type (Assembly, business, educational, factory/industrial, high hazard, institutional, mercantile, residential, storage, utility/miscellaneous) :
61. Approximate number of staff to occupy facility:
62. Approximate number of visitors per day:
63. Will this project require funding for any furnishings, fixtures and equipment?
64. For existing facilities, are there any known hazardous materials? (e.g., Asbestos, lead paint or underground storage tanks):
65. How many years of future growth will this project accommodate? 30
66. List of required facilites (laboratory space, classroom space, office space, conference rooms, cafeterias, maintenance shops, garages) and any unusual related equipment required for your project: