I. Administrative Section 
1. Project Name: Canopy Installation
2. Project Description (One Sentence): Install a canopy along the front of the maintenance building to reduce utility costs and reduce the chance of the hot metal doors burning the bare skin of cemetery staff and the public.
3a. Project Location: County: Clark
3b. Project Location: City: Boulder City
4. Department (department requesting project): Veterans Services
5. Division (division requesting project): Veterans Cemetery
6. Agency (agency requesting project): N/A
7. Agency contact person: Chris Naylor
8. Contact phone: 702-486-5920 x221
9. Contact email: naylorc@veterans.nv.gov
The Department ranking of this project:
10. The Department will rank their projects 1 through the lowest ranked project (i.e., If 5 projects were submitted by the Department a ranking of 1 would be assigned to the most important or most needed project and a ranking of 5 would be the least needed project). 3
11. Has this project been previously requested in a prior CIP? No
12. SPWD 4 digit Building No. (for existing buildings) 2997
13. Facility Condition Analysis Project No. (if recommended) 2997ENR1
14. Is the property State Owned? Yes
15. If the facility is existing, is it State owned? Yes
II. Narrative Section 
1. Project Description: Install a canopy along the front of the maintenance building to reduce utility costs and reduce the chance of the hot metal doors burning the bare skin of cemetery staff and the public.
2. Project Justification: The State Public Works Division Facility Condition Analysis report identified that the metal rolling doors and standard doors that are on the south facing elevation of the maintenance building have no protection from the sun causing a safety hazard. The metal doors get so hot that you cannot touch them with bare hands as the heat burns bare skin and there is an enormous heat load coming through the windows and doors even in winter months. A canopy along the entire south elevation is required to block the direct sunlight against the building.
3. Project Background Information: The metal doors on the building get so hot they burn bare skin when touched.
4. Mechanical and/or Electrical Equipment Replacement Projects:
a. Type of equipment to be replaced:
b. Year existing equipment was installed:
c. Manufacturer of existing equipment:
d. Model of existing equipment:
e. Are there any known hazardous material abatement? No
5. Ramifications if the Project is not Approved (short essay): Possibility of a severe burn may occur to a cemetery staff member or a member of the public and increased utility costs to cool the building will continue to be higher if a canopy is not installed.
Health, Life Safety, and/or Legal Issues
6. Please describe any health, life safety, and/or legal issues that will be resolved by completing this project (Short Essay): The completion of the project will reduce the possibility of a cemetery staff member or a member of the public of becoming severely burned on the hot metal doors.
7. Proposed Project Schedule Impacts/Issues
a. Will this project require relocating personnel or vacating the building for any period of time? No
Explain: Work will be outside of the building and will have no impact to the daily work being performed.
b. Has any design work been completed on the proposed project? No
c. What is the latest date this project could be completed without disrupting your program?
d. What is the driving proposed completion date?
III. Preliminary Construction and Funding Sources Section 
Preliminary Construction Cost Estimate and Funding Sources (The SPWD will prepare all final cost estimates. This schedule is for preliminary purposes only.)
1. Land (if land must be purchased):
2. Off-site construction:
3. On-site Development: 135000
4. Utility connection fees:
5. Water rights deeded:
6. Furniture, Fixture and Equipment:
7. Specialty equipment:
8. Data and network equipment:
9. Telephone equipment costs:
10. Moving:
11. Renovation of vacated space:
12. Correction of known deficiencies:
(describe deficiencies)
13. Any known commitments:
(describe commitments)
14. Known hazardous material abatement:
(describe hazardous materials)
15. Total project costs:
NOTE: COSTS FOR EXTENDED LEASE AGREEMENTS MUST BE INCLUDED IN YOUR OPERATING BUDGET
16. Proposed funding of total project cost:
a. Agency:
b. Federal
c. Other/Donor
d. State 135000
(describe source of 'Other/ Donor' funding):
Total: 135000
17. Agency point of contact for outisde funding if 16a, 16b, or 16c funding sources are providing funds.
a. Name
b. Phone Number
c. Email Address
IV. Site Analysis Section 
Site Analysis (New construction only)
1. Estimated land area to be acquired (acres)
2. Will this project require new parking spaces? No
3. Are utilities available to site? Yes
4. Will project require relocation of existing utilities? No
5. Are there any required off-site improvements (or right-of-way dedications)? No
6. Is the site in a flood plain? No
7. Is the site in an airport impact zone? No
8. Does the site contain any underground storage tanks? No
9. Does the site contain any adverse soil conditions? No
10. Will the site require an environmental assessment? No
11. Will rezoning or a special use permit be required? No
12. Will any Utility connection fees need to be paid? No
13. Will any water rights need to be deeded? No
14. Will construction traffic degrade existing access or facilities? No
15. Will the site require any hazardous material abatement? No
16. Other site considerations affecting cost? (describe): No
Describe Site Considerations:
V. Programming Section 
Programming (New construction, building remodels, and building additions only)
1. Has any architectural programming occurred?
(Programming is an architectural definition of the needs/problems that must be addressed by the project)
2. Has any advanced planning occurred in previous CIPs? No
3. Usable Square footage required (including storage space)
a. New Construction SF:
b. Remodel/Renovation SF:
c. Addition SF
d.Total project SF:
4. Occupancy type (Assembly, business, educational, factory/industrial, high hazard, institutional, mercantile, residential, storage, utility/miscellaneous) :
5. Approximate number of staff to occupy facility:
6. Approximate number of visitors per day:
7. Will this project require funding for any furnishings, fixtures and equipment? No
8. For existing facilities, are there any known hazardous materials? (i.e., Asbestos, lead paint or underground storage tanks): No
9. How many years of future growth will this project accommodate?
10. List of required facilites (laboratory space, classroom space, office space, conference rooms, cafeterias, maintenance shops, garages) and any unusual related equipment required for your project:

Submit


NOTE:  AFTER SUBMITTING THE COMPLETED APPLICATION, A PROJECT MANAGER FROM THE PUBLIC WORKS DIVISION WILL CONTACT YOU TO REVIEW THIS APPLICATION.