View Application for a 2015 CIP Project

View All 2015 CIP Applications                    

AppID5234
I. Administrative Section 
1. Project Name: Drip Edge Installation
2. Project Description (One Sentence): Install flashing and caulking as needed around the entire perimeter of the building to seal all of the gaps.
3a. Project Location: County: Clark
3b. Project Location: City: Boulder City
4. Department (department requesting project): Veterans Services
5. Division (division requesting project): Veterans Nursing Home
6. Agency (agency requesting project): N/A
7. Agency contact person: Robert Robinson
8. Contact phone: 702-332-6751
9. Contact email: robinsonr@veterans.nv.gov
The Department ranking of this project:
10. The Department will rank their projects 1 through the lowest ranked project (i.e., If 5 projects were submitted by the Department a ranking of 1 would be assigned to the most important or most needed project and a ranking of 5 would be the least needed project). 1
11. Has this project been previously requested in a prior CIP? No
12. SPWD 4 digit Building No. (for existing buildings) 2106
13. Facility Condition Analysis Project No. (if recommended) 9889
14. Is the property State Owned? Yes
15. If the facility is existing, is it State owned? Yes
II. Narrative Section 
1. Project Description: This project provides for installation of a drip edge to direct water away from the building, flashing, and caulking as needed around the entire perimeter of the building to seal gaps that have formed between the building's foundation and the physical structure.
2. Project Justification: Due to ground settling and continuous expansion and contraction of the building's surfaces, gaps have developed between the foundation and the metal framing of the building. In many of these areas, there are gaps large enough to allow rodents and insects to enter the walls and infest the building. This condition also allows moisture to penetrate the walls which will lead to premature failure of the walls and mold related issues. In order to avoid citations during surveys completed by the federal governmental agencies, the facility has completed 3 abatement projects to mitigate damage caused by rodents and insect infestations due to this problem. This project will eliminate existing gaps and prevent future occurrences, it will also mitigate potential for mold growth in the walls of the facility. Recommended in Facility Condition Analysis.
3. Project Background Information: The Nevada State Veterans Home is an 85,000 square foot 180 bed long term care facility governed by multiple federal regulations including 42 CFR 483 - Requirements for States and Long Term Care facilities and 38 CFR 51.60 - Standards applicable for payment of per diem. CFR 483.70 and CFR 51.70 require that the facility be designed, constructed, equipped, and maintained to protect the health and safety of residents, personnel, and the public. Although the Veterans Home didn't begin admitting residents until August of 2002, construction of the facility was largely completed in late 1999.
4. Mechanical and/or Electrical Equipment Replacement Projects:
a. Type of equipment to be replaced:
b. Year existing equipment was installed:
c. Manufacturer of existing equipment:
d. Model of existing equipment:
e. Are there any known hazardous material abatement? Yes
5. Ramifications if the Project is not Approved (short essay): CFR 483.70 and CFR 51.70 require that the facility be designed, constructed, equipped, and maintained to protect the health and safety of residents, personnel, and the public. CFR 483.70 (h) (4) specifically requires that the facility be maintained in order to be free of pests and rodents. Due to ground settling and continuous expansion and contraction of the building's surfaces, gaps have developed between the foundation and the metal framing of the building. In many of these areas, there are gaps large enough to allow rodents and insects to enter the walls and infest the building. This condition also allows moisture to penetrate the walls which will lead to premature failure of the walls and possibly mold related issues. The facility has completed 3 abatement projects to mitigate damage caused by rodents and insect infestations due to this problem. If the facility is found to be out of compliance with CFR 483.70 and CFR 51.70, the federal government's recourse includes; monetary fines, sanctions on new admissions, or closure of the facility.
Health, Life Safety, and/or Legal Issues
6. Please describe any health, life safety, and/or legal issues that will be resolved by completing this project (Short Essay): The Nevada State Veterans Home is an 85,000 square foot 180 bed long term care facility governed by multiple federal regulations including 42 CFR 483 - Requirements for States and Long Term Care facilities and 38 CFR 51.60 - Standards applicable for payment of per diem. CFR 483.70 and CFR 51.70 require that the facility be designed, constructed, equipped, and maintained to protect the health and safety of residents, personnel, and the public. CFR 483.70 (h) (4) specifically requires that the facility be maintained in order to be free of pests and rodents. The facility has completed 3 abatement projects to mitigate damage caused by rodents and insect infestations due to this problem. This project will eliminate existing gaps and prevent future occurrences, it will also mitigate potential for mold growth in the walls of the facility, help promote a sanitary living environment for our residents, and enable the facility to maintain compliance with CFR regulations.
7. Proposed Project Schedule Impacts/Issues
a. Will this project require relocating personnel or vacating the building for any period of time? No
Explain:
b. Has any design work been completed on the proposed project? No
c. What is the latest date this project could be completed without disrupting your program? 06-30-2017
d. What is the driving proposed completion date? Failure to complete this project in the specified time frame will increase the potential for citations and fines during yearly inspections completed by federal governmental agencies.
III. Preliminary Construction and Funding Sources Section 
Preliminary Construction Cost Estimate and Funding Sources (The SPWD will prepare all final cost estimates. This schedule is for preliminary purposes only.)
1. Land (if land must be purchased):
2. Off-site construction:
3. On-site Development:
4. Utility connection fees:
5. Water rights deeded:
6. Furniture, Fixture and Equipment:
7. Specialty equipment:
8. Data and network equipment:
9. Telephone equipment costs:
10. Moving:
11. Renovation of vacated space:
12. Correction of known deficiencies:
(describe deficiencies)
13. Any known commitments:
(describe commitments)
14. Known hazardous material abatement:
(describe hazardous materials)
15. Total project costs:
NOTE: COSTS FOR EXTENDED LEASE AGREEMENTS MUST BE INCLUDED IN YOUR OPERATING BUDGET
16. Proposed funding of total project cost:
a. Agency:
b. Federal
c. Other/Donor
d. State
(describe source of 'Other/ Donor' funding):
Total: 9,400
17. Agency point of contact for outisde funding if 16a, 16b, or 16c funding sources are providing funds.
a. Name
b. Phone Number
c. Email Address
IV. Site Analysis Section 
Site Analysis (New construction only)
1. Estimated land area to be acquired (acres)
2. Will this project require new parking spaces?
3. Are utilities available to site?
4. Will project require relocation of existing utilities?
5. Are there any required off-site improvements (or right-of-way dedications)?
6. Is the site in a flood plain?
7. Is the site in an airport impact zone?
8. Does the site contain any underground storage tanks?
9. Does the site contain any adverse soil conditions?
10. Will the site require an environmental assessment?
11. Will rezoning or a special use permit be required?
12. Will any Utility connection fees need to be paid?
13. Will any water rights need to be deeded?
14. Will construction traffic degrade existing access or facilities?
15. Will the site require any hazardous material abatement?
16. Other site considerations affecting cost? (describe):
Describe Site Considerations:
V. Programming Section 
Programming (New construction, building remodels, and building additions only)
1. Has any architectural programming occurred?
(Programming is an architectural definition of the needs/problems that must be addressed by the project)
2. Has any advanced planning occurred in previous CIPs?
3. Usable Square footage required (including storage space)
a. New Construction SF:
b. Remodel/Renovation SF:
c. Addition SF
d.Total project SF:
4. Occupancy type (Assembly, business, educational, factory/industrial, high hazard, institutional, mercantile, residential, storage, utility/miscellaneous) :
5. Approximate number of staff to occupy facility:
6. Approximate number of visitors per day:
7. Will this project require funding for any furnishings, fixtures and equipment?
8. For existing facilities, are there any known hazardous materials? (i.e., Asbestos, lead paint or underground storage tanks):
9. How many years of future growth will this project accommodate?
10. List of required facilites (laboratory space, classroom space, office space, conference rooms, cafeterias, maintenance shops, garages) and any unusual related equipment required for your project:

Submit


NOTE:  AFTER SUBMITTING THE COMPLETED APPLICATION, A PROJECT MANAGER FROM THE PUBLIC WORKS DIVISION WILL CONTACT YOU TO REVIEW THIS APPLICATION.