1. Project Name: Upgrade GE Access Door Controls Rawson-Neal
2. Project Description (One Sentence): Upgrade GE Access Controls, existing software/hardware
3a. Project Location: County: Clark
3b. Project Location: City: Las Vegas
4. Department (department requesting project): DHHS
5. Division (division requesting project): MH/DS
6. Agency (agency requesting project): SNAMHS
7. Agency contact person: Les Sharp
8. Contact phone: 702-498-2493
9. Contact email: lsharp@health.nv.gov
The Department ranking of this project:
10. The Department will rank their projects 1 through the lowest ranked project (i.e., If 5 projects were submitted by the Department a ranking of 1 would be assigned to the most important or most needed project and a ranking of 5 would be the least needed project).
11. Has this project been previously requested in a prior CIP?
12. SPWD 4 digit Building No. (for existing buildings) 9984
13. Facility Condition Analysis Project No. (if recommended)
14. Is the property State Owned? Yes
15. If the facility is existing, is it State owned? Yes
II. Narrative Section 
1. Project Description: This project would update access controls GE Diamond ll software, ACUXL-16 Network Intelligent Controllers, RRE Remote Reader Electronic hardware and PROX GE T525W and T500 keypad readers.
2. Project Justification: Existing access control system having software, wiring issues, mechanical failures, many repairs and needed added hardware. We need software training and tech support, contract service agreement and a monitoring dept.
3. Project Background Information: ACUXL-16 Network Intelligent Controllers, RRE Remote Reader Electronic hardware and PROX GE T525W and T500 keypad readers
4. Mechanical and/or Electrical Equipment Replacement Projects:
a. Type of equipment to be replaced: Networked Inteligent Controllers Remote
b. Year existing equipment was installed: 2005/2006
c. Manufacturer of existing equipment: General Electric, Diamond ll software
d. Model of existing equipment: GE T525W keycard reader with keypad
e. Are there any known hazardous material abatement? No
5. Ramifications if the Project is not Approved (short essay): Potential for unsecured 24hr building, numerous costly time and material repairs.
Health, Life Safety, and/or Legal Issues
6. Please describe any health, life safety, and/or legal issues that will be resolved by completing this project (Short Essay): Life safety, access controls all doors in the event of fire or emergencies.
7. Proposed Project Schedule Impacts/Issues
a. Will this project require relocating personnel or vacating the building for any period of time? Unknown
Explain: Can be completed during working hours, staff and patients may have to moved to different secured areas.
b. Has any design work been completed on the proposed project? No
c. What is the latest date this project could be completed without disrupting your program?
d. What is the driving proposed completion date? Update General Electric Diamond ll Access Controls to work the way they are design to; monitoring, anti bypass and updated software/hardware/training. Reduce costly maintenance and contract repairs.
III. Preliminary Construction and Funding Sources Section 
Preliminary Construction Cost Estimate and Funding Sources (The SPWD will prepare all final cost estimates. This schedule is for preliminary purposes only.)
1. Land (if land must be purchased):
2. Off-site construction:
3. On-site Development:
4. Utility connection fees:
5. Water rights deeded:
6. Furniture, Fixture and Equipment:
7. Specialty equipment:
8. Data and network equipment:
9. Telephone equipment costs:
10. Moving:
11. Renovation of vacated space:
12. Correction of known deficiencies:
(describe deficiencies)
13. Any known commitments:
(describe commitments)
14. Known hazardous material abatement:
(describe hazardous materials)
15. Total project costs:
NOTE: COSTS FOR EXTENDED LEASE AGREEMENTS MUST BE INCLUDED IN YOUR OPERATING BUDGET
16. Proposed funding of total project cost:
a. Agency:
b. Federal
c. Other/Donor
d. State TBD
(describe source of 'Other/ Donor' funding):
Total: TBD
17. Agency point of contact for outisde funding if 16a, 16b, or 16c funding sources are providing funds.
a. Name
b. Phone Number
c. Email Address
IV. Site Analysis Section 
Site Analysis (New construction only)
1. Estimated land area to be acquired (acres)
2. Will this project require new parking spaces? No
3. Are utilities available to site? Yes
4. Will project require relocation of existing utilities? No
5. Are there any required off-site improvements (or right-of-way dedications)? No
6. Is the site in a flood plain? Unknown
7. Is the site in an airport impact zone? No
8. Does the site contain any underground storage tanks? No
9. Does the site contain any adverse soil conditions? No
10. Will the site require an environmental assessment? No
11. Will rezoning or a special use permit be required? No
12. Will any Utility connection fees need to be paid? No
13. Will any water rights need to be deeded? No
14. Will construction traffic degrade existing access or facilities? No
15. Will the site require any hazardous material abatement? No
16. Other site considerations affecting cost? (describe): No
Describe Site Considerations:
V. Programming Section 
Programming (New construction, building remodels, and building additions only)
1. Has any architectural programming occurred?
(Programming is an architectural definition of the needs/problems that must be addressed by the project)
2. Has any advanced planning occurred in previous CIPs? No
3. Usable Square footage required (including storage space)
a. New Construction SF:
b. Remodel/Renovation SF:
c. Addition SF
d.Total project SF:
4. Occupancy type (Assembly, business, educational, factory/industrial, high hazard, institutional, mercantile, residential, storage, utility/miscellaneous) :
5. Approximate number of staff to occupy facility:
6. Approximate number of visitors per day:
7. Will this project require funding for any furnishings, fixtures and equipment? No
8. For existing facilities, are there any known hazardous materials? (i.e., Asbestos, lead paint or underground storage tanks): No
9. How many years of future growth will this project accommodate?
10. List of required facilites (laboratory space, classroom space, office space, conference rooms, cafeterias, maintenance shops, garages) and any unusual related equipment required for your project:

Submit