Submitted Application for a 2013 CIP Project

View all 2013 CIP Applications.              

AppID3379
I. Administrative Section 
Project Name: Material and Equipment Protection at the Wild Horse State Recreation Area
Project Description (One Sentence): Provide Equipment and Material Protection/Storage Building at the Wild Horse State Recreation Area
Project Location: County: Elko
Project Location: City: Rural
Department (department requesting project): CNR
Division (division requesting project): Parks
Agency (agency requesting project): Planning
Agency contact person: Mark C. Davis
Contact phone: (775) 684-2772
Contact email: markcdavis@parks.nv.gov
At the Department level ranking of this project:
The Department will rank their projects 1 through the lowest ranked project (i.e., If 5 projects were submitted by the Department a ranking of 1 would be assigned to the most important or most needed project and a ranking of 5 would be the least needed project). 15
Has this project been previously requested in a prior CIP? No
SPWD 4 digit Building No. (for existing buildings) 9935
Facility Condition Analysis Project No. (if recommended)
II. Narrative Section 
Project Justification (Essay)
Project Description: This project would provide a 8,840 square foot, prefabricated metal building. This building requires power, lights, heating and cooling. This would include approximately 300 additional linear feet of fenced yard to protect the area.
Project Justification: The existing shop is being heated with a wood stove, which is a serious health and safety issue. The park does not have adequate storage or an appropriate place to store vehicles and park equipment. A new shop, vehicle, and equipment storage building would eliminate the health and safety issue and provide the needed storage. It will also provide protection for park vehicles & equipment.
Project Background Information: Vehicles and materials are being repaired and replaced much more often than they should be. This is due to the conditions identified in the justification above.
Mechanical and/or Electrical Equipment Replacement Projects:
Type of equipment to be replaced:
Year existing equipment was installed:
Manufacturer of existing equipment:
Model of existing equipment:
Hazardous Materials (Asbestos, Lead Paint, etc.):
Will this project require any hazardous material abatement? Unknown
Ramifications if the Project is not Approved
(Short Essay): If this project is not approved, the existing "shop" will need to continue to operate as a shop (which includes wood work and related supplies) with the wood stove as the shop is used mostly in the winter. This is a life safety hazard that needs to be corrected. There is currently no vehicle, equipment and supply storage. Therefore vehicles, heavy equipment and materials will continue to degrade due to the harsh climate at the park.
Health, Life Safety, and/or Legal Issues
Please describe any health, life safety, and/or legal issues that will be resolved by completing this project (Short Essay): See above item #9.
Proposed Project Schedule Impacts/Issues
1. Will this project require relocating personnel or vacating the building for any period of time? No
Explain:
Has any design work been completed on the proposed project? No
What is the latest date this project could be completed without disrupting your program? 5/15/16
What is the driving proposed completion date? 5/30/16
III. Cost Estimate Section 
Preliminary Cost Estimate and Funding Sources (The SPWD will prepare all final cost estimates. This schedule is for preliminary purposes only.)
1. Land Cost (if land must be purchased): 0.0000
2. Off-site construction cost: 0.0000
3. On-site connection fees: 798565
4. Utility connection fees: 10000
5. Water rights deeded: 0.0000
6. Furniture, Fixture and equipment costs: 0.0000
7. Specialty equipment costs
8. Data and network equipment costs: 0.0000
9. Telephone equipment costs: 0.0000
10. Moving costs: 0.0000
11. Costs for renovation of vacated space: 1000
12. Costs for correction of known deficiencies: 0.0000
(describe deficiencies)
13. Costs of any known commitments: 0.0000
(describe commitments)
14. Costs of any hazardous material abatement: 0.0000
(describe hazardous materials)
15. Total project costs: 0.0000
NOTE: COSTS FOR EXTENDED LEASE AGREEMENTS MUST BE INCLUDED IN YOUR OPERATING BUDGET
16. Proposed funding of total project cost: 0.0000
a. Agency: 0.0000
b. Federal 0.0000
c. Other/Donor 0.0000
d. State 809565
(describe source of 'Other' funding):
Total: 809565
17. Agency point of contact for outisde funding if 16a, 16b, or 16c funding sources are providing funds.
a. Name
b. Phone Number
c. Email Address
IV. Analysis Section 
Site Analysis (New construction only)
1. Estimated land area to be acquired (acres) 0
2. Will this project require new parking spaces? No
3. Are utilities available to site? Yes
4. Will project require relocation of existing utilities? Unknown
5. Are there any required off-site improvements (or right-of-way dedications)? No
6. Is the site in a flood plane? No
7. Is the site in an airport impact zone? No
8. Does the site contain any underground storage tanks? Unknown
9. Does the site contain any adverse soil conditions? Unknown
10. Will the site require an environmental assessment? No
11. Will rezoning or a special use permit be required? No
12. Will any connection fees need to be paid? Yes
13. Will any water rights need to be deeded? No
14. Will construction traffic degrade existing access or facilities? No
15. Will the site require any hazardous material abatement? Unknown
16. Other site considerations affecting cost? (describe): Unknown
V. Programming Section 
Programming (New construction, building remodels, and building additions only)
1. Has any architectural programming occurred? No
(Programming is an architectural definition of the needs/problems that must be addressed by the project) No
2. Has any advanced planning occurred in previous CIPs? No
3. Net Square footage required (including storage space)
New Construction SF: 4650
Remodel/Renovation SF: 800
Addition SF 0
Total project SF:
4. Occupancy type (Assembly, business, educational, factory/industrial, high hazard, institutional, mercantile, residential, storage, utility/miscellaneous) : High Hazard
5. Approximate quantity of staff to occupy facility: 2
6. Approximate number of visitors per day:
7. Will this project require funding for any furnishings, fixtures and equipment? No
8. For existing facilities, are there any known hazardous materials? (i.e., Asbestos, lead paint or underground storage tanks): Unknown
9. How many years of future growth will this project accommodate? 20
10. List of required facilites (laboratory space, classroom space, office space, conference rooms, cafeterias, maintenance shops, garages) and any unusual related equipment required for your project: vehicle/equipment storage and material storage areas for (2) trucks, a backhoe, skid steer, plow truck, trailer, snow removal equipment and heated wood/welding shop.
Submit Status Submit
 