Submitted Application for a 2013 CIP Project

View all 2013 CIP Applications.              

AppID3353
I. Administrative Section 
Project Name: Historic Building Rehabilitation at the Old Las Vegas Mormon Fort State Historic Park
Project Description (One Sentence): Provide a structure to protect the Historic Mormon Fot Museum and Rehabilitate & restore the windows and adobe at the Historic Fort Museum.
Project Location: County: Clark
Project Location: City: Las Vegas
Department (department requesting project): CNR
Division (division requesting project): Parks
Agency (agency requesting project): Planning
Agency contact person: Mark C. Davis
Contact phone: (775) 684-2772
Contact email: markcdavis@parks.nv.gov
At the Department level ranking of this project:
The Department will rank their projects 1 through the lowest ranked project (i.e., If 5 projects were submitted by the Department a ranking of 1 would be assigned to the most important or most needed project and a ranking of 5 would be the least needed project). 12
Has this project been previously requested in a prior CIP?
SPWD 4 digit Building No. (for existing buildings) 1905
Facility Condition Analysis Project No. (if recommended) 1905EXT1
II. Narrative Section 
Project Justification (Essay)
Project Description: Rehabilitate and restore the adobe siding and windows at the Old Las Vegas Mormon Fort, Historic Fort Museum. All work will be compliant with the requirements of SHPO to maintain the historic value of the building. This project would restore adobe finishes that have deteriorated over time, repair windows with historically accurate materials and remove the parapet coping to restore historical accuracy. This project would also include a 1,500 square foot shade/protection structure sympathetic to the historic structure. Adobe work should be completed by a mason experienced in rehabilitation of this type of construction.
Project Justification: The adobe has deteriorated to a point that visible vertical holes are forming in the natural bulges of the existing adobe. Removal of the coping to restore historical accuracy, providing an overhead protective structure and restoration of the adobe is necessary at this time to prevent a loss.
Project Background Information: This is a historic building, constructed in 1855 of adobe masonry, and wood frame windows. Rehabilitation was performed approximately 10 years ago on the adobe. at that time coping was placed at the top of the walls in an attempt to reduce erosion due to rainfall. These copings seem to have directed the water flow to specific areas of the adobe, causing greater damage. The windows have deteriorated over the years of the buildings life, air gaps are now in most if not all windows. This allows dust and insects into the building. These items are regularly triggering the fire and burglar alarms, causing rapid response by staff and emergency responders.
Mechanical and/or Electrical Equipment Replacement Projects:
Type of equipment to be replaced:
Year existing equipment was installed:
Manufacturer of existing equipment:
Model of existing equipment:
Hazardous Materials (Asbestos, Lead Paint, etc.):
Will this project require any hazardous material abatement?
Ramifications if the Project is not Approved
(Short Essay): If this project is not approved, the adobe and windows will continue to deteriorate and eventually fail. This would cause the loss of a Nevada historic treasure.
Health, Life Safety, and/or Legal Issues
Please describe any health, life safety, and/or legal issues that will be resolved by completing this project (Short Essay):
Proposed Project Schedule Impacts/Issues
1. Will this project require relocating personnel or vacating the building for any period of time? No
Explain:
Has any design work been completed on the proposed project? No
What is the latest date this project could be completed without disrupting your program? 5/15/16
What is the driving proposed completion date? 5/30/16
III. Cost Estimate Section 
Preliminary Cost Estimate and Funding Sources (The SPWD will prepare all final cost estimates. This schedule is for preliminary purposes only.)
1. Land Cost (if land must be purchased): 0.0000
2. Off-site construction cost: 0.0000
3. On-site connection fees: 354000
4. Utility connection fees: 0.0000
5. Water rights deeded: 0.0000
6. Furniture, Fixture and equipment costs: 0.0000
7. Specialty equipment costs
8. Data and network equipment costs: 0.0000
9. Telephone equipment costs: 0.0000
10. Moving costs: 0.0000
11. Costs for renovation of vacated space: 0.0000
12. Costs for correction of known deficiencies: 0.0000
(describe deficiencies)
13. Costs of any known commitments: 0.0000
(describe commitments)
14. Costs of any hazardous material abatement: 0.0000
(describe hazardous materials)
15. Total project costs: 0.0000
NOTE: COSTS FOR EXTENDED LEASE AGREEMENTS MUST BE INCLUDED IN YOUR OPERATING BUDGET
16. Proposed funding of total project cost: 0.0000
a. Agency: 0.0000
b. Federal 0.0000
c. Other/Donor 0.0000
d. State 354000
(describe source of 'Other' funding):
Total: 354000
17. Agency point of contact for outisde funding if 16a, 16b, or 16c funding sources are providing funds.
a. Name
b. Phone Number
c. Email Address
IV. Analysis Section 
Site Analysis (New construction only)
1. Estimated land area to be acquired (acres) 0
2. Will this project require new parking spaces? No
3. Are utilities available to site? Yes
4. Will project require relocation of existing utilities? Unknown
5. Are there any required off-site improvements (or right-of-way dedications)? No
6. Is the site in a flood plane? No
7. Is the site in an airport impact zone? No
8. Does the site contain any underground storage tanks? Unknown
9. Does the site contain any adverse soil conditions? Unknown
10. Will the site require an environmental assessment? No
11. Will rezoning or a special use permit be required? No
12. Will any connection fees need to be paid? No
13. Will any water rights need to be deeded? No
14. Will construction traffic degrade existing access or facilities? No
15. Will the site require any hazardous material abatement? Unknown
16. Other site considerations affecting cost? (describe): Unknown
V. Programming Section 
Programming (New construction, building remodels, and building additions only)
1. Has any architectural programming occurred? No
(Programming is an architectural definition of the needs/problems that must be addressed by the project) No
2. Has any advanced planning occurred in previous CIPs? No
3. Net Square footage required (including storage space)
New Construction SF: 1500
Remodel/Renovation SF: 0
Addition SF 0
Total project SF:
4. Occupancy type (Assembly, business, educational, factory/industrial, high hazard, institutional, mercantile, residential, storage, utility/miscellaneous) : Utility/Misc
5. Approximate quantity of staff to occupy facility:
6. Approximate number of visitors per day:
7. Will this project require funding for any furnishings, fixtures and equipment? No
8. For existing facilities, are there any known hazardous materials? (i.e., Asbestos, lead paint or underground storage tanks): Unknown
9. How many years of future growth will this project accommodate? 20
10. List of required facilites (laboratory space, classroom space, office space, conference rooms, cafeterias, maintenance shops, garages) and any unusual related equipment required for your project: Overhead Protection Roof Structure.
Submit Status Submit
 