Submitted Application for a 2013 CIP Project

View all 2013 CIP Applications.              

AppID3310
I. Administrative Section 
Project Name: HVAC Replacement
Project Description (One Sentence): This project would provide for the removal of the existing forced air gas furnace units and installation of two new units, including connections to existing duct work and utilities.
Project Location: County: Washoe
Project Location: City: Sparks
Department (department requesting project): DHHS
Division (division requesting project): MH/DS
Agency (agency requesting project): N/A
Agency contact person: Rob Forderhase
Contact phone: 775 688-1930 ext. 2123
Contact email: rforderhase@src.state.nv.us
At the Department level ranking of this project:
The Department will rank their projects 1 through the lowest ranked project (i.e., If 5 projects were submitted by the Department a ranking of 1 would be assigned to the most important or most needed project and a ranking of 5 would be the least needed project).
Has this project been previously requested in a prior CIP? Yes
SPWD 4 digit Building No. (for existing buildings) 0324
Facility Condition Analysis Project No. (if recommended) 0324HVA1
II. Narrative Section 
Project Justification (Essay)
Project Description: There are two forced air gas furnaces in this facility that have reached the end of their expected life. This project would provide for the removal of the existing units and installation of two new units, including connections to existing duct work and utilities. The existing duct work, diffusers and grills would be cleaned as part of this project.
Project Justification: This project is requested as it is a life/safety issue for persons served, residents, and staff. This project will enable these individuals to have a comfortable environment to reside in.
Project Background Information: This projected is recommended by State Public Works and is a level 2 priority
Mechanical and/or Electrical Equipment Replacement Projects:
Type of equipment to be replaced: N/A
Year existing equipment was installed: N/A
Manufacturer of existing equipment: N/A
Model of existing equipment: N/A
Hazardous Materials (Asbestos, Lead Paint, etc.):
Will this project require any hazardous material abatement? No
Ramifications if the Project is not Approved
(Short Essay): If this project is not approved, this building might not be habitable during the winter months. People would be displaced and the building could fall into further disrepair due to frozen pipes
Health, Life Safety, and/or Legal Issues
Please describe any health, life safety, and/or legal issues that will be resolved by completing this project (Short Essay): There are two forced air gas furnaces in this facility that have reached the end of their expected life. This project would provide for the removal of the existing units and installation of two new units, including connections to existing duct work and utilities. The existing duct work, diffusers and grills would be cleaned as part of this project. This project is requested as it is a life/safety issue for persons served, residents, and staff.
Proposed Project Schedule Impacts/Issues
1. Will this project require relocating personnel or vacating the building for any period of time? No
Explain:
Has any design work been completed on the proposed project? Unknown
What is the latest date this project could be completed without disrupting your program? 06/30/2015
What is the driving proposed completion date? 06/30/2015
III. Cost Estimate Section 
Preliminary Cost Estimate and Funding Sources (The SPWD will prepare all final cost estimates. This schedule is for preliminary purposes only.)
1. Land Cost (if land must be purchased): 0.0000
2. Off-site construction cost: 0.0000
3. On-site connection fees: 30000
4. Utility connection fees: 0.0000
5. Water rights deeded: 0.0000
6. Furniture, Fixture and equipment costs: 0.0000
7. Specialty equipment costs
8. Data and network equipment costs: 0.0000
9. Telephone equipment costs: 0.0000
10. Moving costs: 0.0000
11. Costs for renovation of vacated space: 0.0000
12. Costs for correction of known deficiencies: 0.0000
(describe deficiencies)
13. Costs of any known commitments: 0.0000
(describe commitments)
14. Costs of any hazardous material abatement: 0.0000
(describe hazardous materials)
15. Total project costs: 0.0000
NOTE: COSTS FOR EXTENDED LEASE AGREEMENTS MUST BE INCLUDED IN YOUR OPERATING BUDGET
16. Proposed funding of total project cost: 0.0000
a. Agency: 0.0000
b. Federal 0.0000
c. Other/Donor 0.0000
d. State 30000
(describe source of 'Other' funding):
Total: 30000
17. Agency point of contact for outisde funding if 16a, 16b, or 16c funding sources are providing funds.
a. Name
b. Phone Number
c. Email Address
IV. Analysis Section 
Site Analysis (New construction only)
1. Estimated land area to be acquired (acres) 0
2. Will this project require new parking spaces? No
3. Are utilities available to site? No
4. Will project require relocation of existing utilities? No
5. Are there any required off-site improvements (or right-of-way dedications)? No
6. Is the site in a flood plane? No
7. Is the site in an airport impact zone? No
8. Does the site contain any underground storage tanks? No
9. Does the site contain any adverse soil conditions? No
10. Will the site require an environmental assessment? No
11. Will rezoning or a special use permit be required? No
12. Will any connection fees need to be paid? No
13. Will any water rights need to be deeded? No
14. Will construction traffic degrade existing access or facilities? No
15. Will the site require any hazardous material abatement? No
16. Other site considerations affecting cost? (describe): No
V. Programming Section 
Programming (New construction, building remodels, and building additions only)
1. Has any architectural programming occurred? Unknown
(Programming is an architectural definition of the needs/problems that must be addressed by the project) Unknown
2. Has any advanced planning occurred in previous CIPs? Unknown
3. Net Square footage required (including storage space)
New Construction SF: 0
Remodel/Renovation SF: 0
Addition SF 0
Total project SF:
4. Occupancy type (Assembly, business, educational, factory/industrial, high hazard, institutional, mercantile, residential, storage, utility/miscellaneous) : Business
5. Approximate quantity of staff to occupy facility: 70
6. Approximate number of visitors per day: 50
7. Will this project require funding for any furnishings, fixtures and equipment? No
8. For existing facilities, are there any known hazardous materials? (i.e., Asbestos, lead paint or underground storage tanks): No
9. How many years of future growth will this project accommodate? 0
10. List of required facilites (laboratory space, classroom space, office space, conference rooms, cafeterias, maintenance shops, garages) and any unusual related equipment required for your project:
Submit Status Submit
 