Submitted Application for a 2013 CIP Project

View all 2013 CIP Applications.              

AppID3155
I. Administrative Section 
Project Name: North Decatur DMV Lobby Tile Flooring Replacement
Project Description (One Sentence): Replacement of the severly damaged terrazzo tile flooring in the main lobby of the North Decatur DMV.
Project Location: County: Clark
Project Location: City: Las Vegas
Department (department requesting project): Administration
Division (division requesting project): Buildings & Grounds
Agency (agency requesting project): N/A
Agency contact person: Doug Hartwell
Contact phone: 702-486-4099
Contact email: dhartwell@admin.nv.gov
At the Department level ranking of this project:
The Department will rank their projects 1 through the lowest ranked project (i.e., If 5 projects were submitted by the Department a ranking of 1 would be assigned to the most important or most needed project and a ranking of 5 would be the least needed project). 8
Has this project been previously requested in a prior CIP? Unknown
SPWD 4 digit Building No. (for existing buildings) 2453
Facility Condition Analysis Project No. (if recommended) 2453INT3
II. Narrative Section 
Project Justification (Essay)
Project Description: The terrazzo tile flooring in the main Lobby is severely damaged throughout and should be replaced. This project would provide for removal and disposal of the existing tile and installation of new tile with a 6" cove base.
Project Justification: The tiles are breaking at the corners, the grout is failing and there are significant cracks across large sections of tiles. This is a heavily used area and could pose a safety issue with potential tripping hazards to the public and employees.
Project Background Information: The terrazzo tile flooring cracking and deterioration was documented by Buildings and Grounds in May of 2009. Investigation by Buildings and Grounds into the cracking issue appears that a incorrect thin set was applied for the tiles. Warranty of the tiles was pursured but the warranty period had expired by May of 2009. Also there was no supporting documentation for the warranty period.
Mechanical and/or Electrical Equipment Replacement Projects:
Type of equipment to be replaced:
Year existing equipment was installed:
Manufacturer of existing equipment:
Model of existing equipment:
Hazardous Materials (Asbestos, Lead Paint, etc.):
Will this project require any hazardous material abatement? Unknown
Ramifications if the Project is not Approved
(Short Essay): The tile floor will continue to deteriorate and be a trip and fall hazard.
Health, Life Safety, and/or Legal Issues
Please describe any health, life safety, and/or legal issues that will be resolved by completing this project (Short Essay): The tripping hazard caused by the deteriorated tile floor will be eliminated.
Proposed Project Schedule Impacts/Issues
1. Will this project require relocating personnel or vacating the building for any period of time? Unknown
Explain: The main lobby is a heavily used area; repairs will have to be made during non working that DMV is open to the public or smaller sections of the main lobby could be repaired one section at a time.
Has any design work been completed on the proposed project? Unknown
What is the latest date this project could be completed without disrupting your program?
What is the driving proposed completion date?
III. Cost Estimate Section 
Preliminary Cost Estimate and Funding Sources (The SPWD will prepare all final cost estimates. This schedule is for preliminary purposes only.)
1. Land Cost (if land must be purchased):
2. Off-site construction cost:
3. On-site connection fees:
4. Utility connection fees:
5. Water rights deeded:
6. Furniture, Fixture and equipment costs:
7. Specialty equipment costs
8. Data and network equipment costs:
9. Telephone equipment costs:
10. Moving costs:
11. Costs for renovation of vacated space:
12. Costs for correction of known deficiencies: 135000
(describe deficiencies)
13. Costs of any known commitments:
(describe commitments)
14. Costs of any hazardous material abatement:
(describe hazardous materials)
15. Total project costs:
NOTE: COSTS FOR EXTENDED LEASE AGREEMENTS MUST BE INCLUDED IN YOUR OPERATING BUDGET
16. Proposed funding of total project cost:
a. Agency:
b. Federal
c. Other/Donor
d. State
(describe source of 'Other' funding):
Total:
17. Agency point of contact for outisde funding if 16a, 16b, or 16c funding sources are providing funds.
a. Name
b. Phone Number
c. Email Address
IV. Analysis Section 
Site Analysis (New construction only)
1. Estimated land area to be acquired (acres)
2. Will this project require new parking spaces?
3. Are utilities available to site?
4. Will project require relocation of existing utilities?
5. Are there any required off-site improvements (or right-of-way dedications)?
6. Is the site in a flood plane?
7. Is the site in an airport impact zone?
8. Does the site contain any underground storage tanks?
9. Does the site contain any adverse soil conditions?
10. Will the site require an environmental assessment?
11. Will rezoning or a special use permit be required?
12. Will any connection fees need to be paid?
13. Will any water rights need to be deeded?
14. Will construction traffic degrade existing access or facilities?
15. Will the site require any hazardous material abatement?
16. Other site considerations affecting cost? (describe):
V. Programming Section 
Programming (New construction, building remodels, and building additions only)
1. Has any architectural programming occurred?
(Programming is an architectural definition of the needs/problems that must be addressed by the project)
2. Has any advanced planning occurred in previous CIPs?
3. Net Square footage required (including storage space)
New Construction SF:
Remodel/Renovation SF:
Addition SF
Total project SF:
4. Occupancy type (Assembly, business, educational, factory/industrial, high hazard, institutional, mercantile, residential, storage, utility/miscellaneous) : Select
5. Approximate quantity of staff to occupy facility:
6. Approximate number of visitors per day:
7. Will this project require funding for any furnishings, fixtures and equipment?
8. For existing facilities, are there any known hazardous materials? (i.e., Asbestos, lead paint or underground storage tanks):
9. How many years of future growth will this project accommodate?
10. List of required facilites (laboratory space, classroom space, office space, conference rooms, cafeterias, maintenance shops, garages) and any unusual related equipment required for your project:
Submit Status Submit
 