Submitted Application for a 2013 CIP Project

View all 2013 CIP Applications.              

AppID3135
I. Administrative Section 
Project Name: Lost City Museum Exterior Site Lighting
Project Description (One Sentence): Install security lighting in existing parking lots and roadways.
Project Location: County: Clark
Project Location: City: Overton
Department (department requesting project): Cultural Affairs
Division (division requesting project): Museums & History
Agency (agency requesting project): Lost City Museum
Agency contact person: Janie Shakespear
Contact phone: 1-702-397-2193
Contact email: jshakespear@nevadaculture.org
At the Department level ranking of this project:
The Department will rank their projects 1 through the lowest ranked project (i.e., If 5 projects were submitted by the Department a ranking of 1 would be assigned to the most important or most needed project and a ranking of 5 would be the least needed project). 8
Has this project been previously requested in a prior CIP? Yes
SPWD 4 digit Building No. (for existing buildings) 0267
Facility Condition Analysis Project No. (if recommended) 9964SEC1
II. Narrative Section 
Project Justification (Essay)
Project Description: This project would provide funding for purchase and installation of sixteen 16' 0" high pole lights including 30" diameter raised concrete bases, electrical trenching, conduit, wiring and connections to existing utilities. LED lighting fixtures are recomended for energy savings.
Project Justification: This project was recommended in a SPWB facility report prepared in 2008. The report recommends 16 security light fixtures be installed around the parking areas and roadways and additional luminaries along walkways and architectural features.
Project Background Information: Exterior lighting at night and the area surrounding the museum is very dark.
Mechanical and/or Electrical Equipment Replacement Projects:
Type of equipment to be replaced: Lighting
Year existing equipment was installed:
Manufacturer of existing equipment:
Model of existing equipment:
Hazardous Materials (Asbestos, Lead Paint, etc.):
Will this project require any hazardous material abatement? Unknown
Ramifications if the Project is not Approved
(Short Essay): Lack of security lighting can lead to accidents for which the state may be found liable. Lack of lighting also may lead to criminal activity relating to parked vehicles, museum visitors and the museum and its contents.
Health, Life Safety, and/or Legal Issues
Please describe any health, life safety, and/or legal issues that will be resolved by completing this project (Short Essay): The Lost City Museum is located in a rural setting south of the town of Overton and set off the highway by a winding roadway. At night, the area surrounding the museum is very dark, being removed from other businesses and from the main highway. Security lighting is important for people walking from the parking areas to the museum to avoid falls as elevations change from roadways to sidewalks and on stairs. Security lighting also increases the safety of property such as parked cars, out buildings and the museum and its contents. Lighting along roadways helps reduce accidents involving vehicles with other vehicles and pedestrians.
Proposed Project Schedule Impacts/Issues
1. Will this project require relocating personnel or vacating the building for any period of time? No
Explain:
Has any design work been completed on the proposed project? Unknown
What is the latest date this project could be completed without disrupting your program? 07/01/14
What is the driving proposed completion date?
III. Cost Estimate Section 
Preliminary Cost Estimate and Funding Sources (The SPWD will prepare all final cost estimates. This schedule is for preliminary purposes only.)
1. Land Cost (if land must be purchased):
2. Off-site construction cost:
3. On-site connection fees:
4. Utility connection fees:
5. Water rights deeded:
6. Furniture, Fixture and equipment costs:
7. Specialty equipment costs
8. Data and network equipment costs:
9. Telephone equipment costs:
10. Moving costs:
11. Costs for renovation of vacated space:
12. Costs for correction of known deficiencies:
(describe deficiencies)
13. Costs of any known commitments:
(describe commitments)
14. Costs of any hazardous material abatement:
(describe hazardous materials)
15. Total project costs:
NOTE: COSTS FOR EXTENDED LEASE AGREEMENTS MUST BE INCLUDED IN YOUR OPERATING BUDGET
16. Proposed funding of total project cost:
a. Agency:
b. Federal
c. Other/Donor
d. State 176650
(describe source of 'Other' funding):
Total: 176650
17. Agency point of contact for outisde funding if 16a, 16b, or 16c funding sources are providing funds.
a. Name
b. Phone Number
c. Email Address
IV. Analysis Section 
Site Analysis (New construction only)
1. Estimated land area to be acquired (acres) 0
2. Will this project require new parking spaces? Unknown
3. Are utilities available to site? Unknown
4. Will project require relocation of existing utilities? Unknown
5. Are there any required off-site improvements (or right-of-way dedications)? Unknown
6. Is the site in a flood plane? Unknown
7. Is the site in an airport impact zone? Unknown
8. Does the site contain any underground storage tanks? Unknown
9. Does the site contain any adverse soil conditions? Unknown
10. Will the site require an environmental assessment? Unknown
11. Will rezoning or a special use permit be required? Unknown
12. Will any connection fees need to be paid? Unknown
13. Will any water rights need to be deeded? Unknown
14. Will construction traffic degrade existing access or facilities? Unknown
15. Will the site require any hazardous material abatement? Unknown
16. Other site considerations affecting cost? (describe): Unknown
V. Programming Section 
Programming (New construction, building remodels, and building additions only)
1. Has any architectural programming occurred? Unknown
(Programming is an architectural definition of the needs/problems that must be addressed by the project) Unknown
2. Has any advanced planning occurred in previous CIPs? Unknown
3. Net Square footage required (including storage space)
New Construction SF:
Remodel/Renovation SF:
Addition SF
Total project SF:
4. Occupancy type (Assembly, business, educational, factory/industrial, high hazard, institutional, mercantile, residential, storage, utility/miscellaneous) : Utility/Misc
5. Approximate quantity of staff to occupy facility:
6. Approximate number of visitors per day: 100
7. Will this project require funding for any furnishings, fixtures and equipment? Yes
8. For existing facilities, are there any known hazardous materials? (i.e., Asbestos, lead paint or underground storage tanks): Unknown
9. How many years of future growth will this project accommodate? 50
10. List of required facilites (laboratory space, classroom space, office space, conference rooms, cafeterias, maintenance shops, garages) and any unusual related equipment required for your project:
Submit Status Submit
 