Submitted Application for a 2013 CIP Project

View all 2013 CIP Applications.              

AppID3030
I. Administrative Section 
Project Name: Lovelock Correctional Center - Replace 4 pipe underground system
Project Description (One Sentence): Replace 4 pipe underground system
Project Location: County: Pershing
Project Location: City: Lovelock
Department (department requesting project): Corrections
Division (division requesting project): Lovelock Correctional Center
Agency (agency requesting project): N/A
Agency contact person: Kent LeFevre
Contact phone: 702.486.9928
Contact email: klefevre@doc.nv.gov
At the Department level ranking of this project:
The Department will rank their projects 1 through the lowest ranked project (i.e., If 5 projects were submitted by the Department a ranking of 1 would be assigned to the most important or most needed project and a ranking of 5 would be the least needed project). 5
Has this project been previously requested in a prior CIP? No
SPWD 4 digit Building No. (for existing buildings) 9962
Facility Condition Analysis Project No. (if recommended)
II. Narrative Section 
Project Justification (Essay)
Project Description: Replace 4 pipe underground system and 20 service vaults that access this system. Replace valves, connections, vault walls, floors and lids for a complete installation. The Department has spent $27,733.00 in the past 18 months repairing these pipes.
Project Justification: The existing 4 pipe system is deteriorating from the outside in. The sealed and insulated outside jacket is compromised to the point that ground water and salts in the soil have crodede the pipe and the pipes have rusted to failure at manylocations. Of the 20 Vaults this service this system 16 are beyond repair as the lids of these vaults are rusted metal that poses a fall / safetly hazard to anyone standing on them.
Project Background Information: Duirng the past two years, the failures of this piping system has interrupted the operations of this facility. The pipes were installed in 1993 when the facility was opened and have outlived their useful life.
Mechanical and/or Electrical Equipment Replacement Projects:
Type of equipment to be replaced:
Year existing equipment was installed:
Manufacturer of existing equipment:
Model of existing equipment:
Hazardous Materials (Asbestos, Lead Paint, etc.):
Will this project require any hazardous material abatement?
Ramifications if the Project is not Approved
(Short Essay): If this system is not replaced the new boilers in the Central Plant are at risk of being clogged by foreign matter that will enter the pipe from the ground or other sources and damage or destroy the new boilers and the existing ones. The financial risk to the State in terms of the new boilers alone is over 2 million dollars.
Health, Life Safety, and/or Legal Issues
Please describe any health, life safety, and/or legal issues that will be resolved by completing this project (Short Essay): In order to maintain the health, welfare and security of the Inmates and the Staff this project needs to be done. Health risks such as extreem cold and/ or heat could happen if this project is not implemented.
Proposed Project Schedule Impacts/Issues
1. Will this project require relocating personnel or vacating the building for any period of time? Unknown
Explain:
Has any design work been completed on the proposed project? No
What is the latest date this project could be completed without disrupting your program? 2013
What is the driving proposed completion date?
III. Cost Estimate Section 
Preliminary Cost Estimate and Funding Sources (The SPWD will prepare all final cost estimates. This schedule is for preliminary purposes only.)
1. Land Cost (if land must be purchased): 0.0000
2. Off-site construction cost: 0.0000
3. On-site connection fees: 0.0000
4. Utility connection fees: 0.0000
5. Water rights deeded: 0.0000
6. Furniture, Fixture and equipment costs: 0.0000
7. Specialty equipment costs
8. Data and network equipment costs:
9. Telephone equipment costs:
10. Moving costs:
11. Costs for renovation of vacated space:
12. Costs for correction of known deficiencies: 27733
(describe deficiencies) Repairs to 3 locations of pipe. Each at a different place on the campus.
13. Costs of any known commitments: 0.0000
(describe commitments)
14. Costs of any hazardous material abatement: 0.0000
(describe hazardous materials)
15. Total project costs: 0.0000
NOTE: COSTS FOR EXTENDED LEASE AGREEMENTS MUST BE INCLUDED IN YOUR OPERATING BUDGET
16. Proposed funding of total project cost:
a. Agency:
b. Federal
c. Other/Donor
d. State 3000000
(describe source of 'Other' funding):
Total: 3000000
17. Agency point of contact for outisde funding if 16a, 16b, or 16c funding sources are providing funds.
a. Name
b. Phone Number
c. Email Address
IV. Analysis Section 
Site Analysis (New construction only)
1. Estimated land area to be acquired (acres) 0
2. Will this project require new parking spaces? No
3. Are utilities available to site? Yes
4. Will project require relocation of existing utilities? No
5. Are there any required off-site improvements (or right-of-way dedications)? No
6. Is the site in a flood plane? No
7. Is the site in an airport impact zone? No
8. Does the site contain any underground storage tanks? No
9. Does the site contain any adverse soil conditions? No
10. Will the site require an environmental assessment? No
11. Will rezoning or a special use permit be required? No
12. Will any connection fees need to be paid? No
13. Will any water rights need to be deeded? No
14. Will construction traffic degrade existing access or facilities? No
15. Will the site require any hazardous material abatement? No
16. Other site considerations affecting cost? (describe): Unknown
V. Programming Section 
Programming (New construction, building remodels, and building additions only)
1. Has any architectural programming occurred? No
(Programming is an architectural definition of the needs/problems that must be addressed by the project) No
2. Has any advanced planning occurred in previous CIPs? No
3. Net Square footage required (including storage space)
New Construction SF: 0
Remodel/Renovation SF: 0
Addition SF 0
Total project SF:
4. Occupancy type (Assembly, business, educational, factory/industrial, high hazard, institutional, mercantile, residential, storage, utility/miscellaneous) : Institutional
5. Approximate quantity of staff to occupy facility: 0
6. Approximate number of visitors per day: 0
7. Will this project require funding for any furnishings, fixtures and equipment?
8. For existing facilities, are there any known hazardous materials? (i.e., Asbestos, lead paint or underground storage tanks): No
9. How many years of future growth will this project accommodate? 20
10. List of required facilites (laboratory space, classroom space, office space, conference rooms, cafeterias, maintenance shops, garages) and any unusual related equipment required for your project:
Submit Status Submit
 